Tap / click on image to see more RealViewsTM
$182.00
per watch
Conrail had a bad day Watch
Qty:
Heads-up!
Size
Style
About Watches
Sold by
About This Design
Conrail had a bad day Watch
In april 1999 Conrail had a bad day on the richmond industrial track. This locomotive split a switch and derailed, because the speed of the switching locomotive was very slow it did not leave the track and turn over . conrail brought in 2 cranes and lifted the locomotive back on the track the same day. There was no interruption in freight service. photo © Stan Feldman april 1999
Customer Reviews
4.5 out of 5 stars rating1.4K Total Reviews
1,411 Reviews
Reviews for similar products
5.0 out of 5 stars rating
5 out of 5 stars ratingBy Anonymous23 June 2024 • Verified Purchase
Watch, Black Vintage Leather
Bought last minute for hubbys 65th birthday. Arrived in NZ by express on the day. Loves it and so does everyone he’s shown it to. Lovely watch and strap and words small but clear. Thank you 😍. Great. Small but clear.
5.0 out of 5 stars rating
5 out of 5 stars ratingBy Anonymous1 January 2025 • Verified Purchase
Love this watch so much 🥰.
from zazzle.com (US)
5.0 out of 5 stars rating
5 out of 5 stars ratingBy Cynthia E.18 December 2015 • Verified Purchase
Zazzle Reviewer Program
Very easy to create a unique watch that I know my husband will love. I particularly liked how easy it was to see exactly how my image would fit in the circle, and I could overlay the numbers clearly. Very clear! Love it!
from zazzle.com (US)
Original product
Tags
Other Info
Product ID: 256606726974750770
Posted on 26/04/2022, 10:54 am
Rating: G
